Obtaining gas supply specifications

Gasification of a residential building allows you to make living in it comfortable and healthy. In addition, the use of blue fuel makes it possible to save on heating and heating water for household needs. The first step in connecting communications is to obtain technical specifications for gas supply. This document confirms the consent and willingness of the supplier to connect the property to existing networks. You can get technical specifications for gas at a commissioned house or building that is under construction.

What are gas specifications and where to turn for them

For quick receipt of technical specifications it is better to contact the intermediary company

Gas specifications are a package of papers, according to which the management company carries out the laying of the pipeline, connecting consumers and registering the subscriber.

TU contain the following information:

  • Estimated fuel consumption
  • place of insertion into the highway;
  • floor plan;
  • pipeline scheme;
  • meter location and fuel consumers;
  • signatures and stamps of interested bodies.

To connect to the network, it is necessary to submit an application for gas supply specifications.

It is possible to draw up authorization papers independently, but not one installation company will accept them for execution. Preparation of documentation is the prerogative of licensed organizations.

To obtain a technical specification for gas connection, you should contact your city, district or regional office. As a rule, these organizations carry out work on the design and installation of equipment. This option is correct in all respects, but the process of going through instances can drag on for years.

It is advisable to contact the intermediary company, whose employees have access to management companies. The intermediary for a moderate surcharge will prepare and coordinate documents, quickly and efficiently perform installation and registration of equipment.

Standard list of documents

Sample TU

The initial stage of obtaining technical specifications for connection to gas supply networks is the collection of necessary papers. Copies should be made in advance so as not to waste time during this process.

The list of documents for obtaining gas specifications:

  • statement;
  • certificate of ownership of the site;
  • land plan with reference to the village;
  • identification;
  • SNILS;
  • floor plan of the house;
  • calculation of fuel consumption;
  • passports for gas appliances and equipment.

If his attorney acts on behalf of the owner, he must present a general power of attorney.

Terms for obtaining technical specifications

The procedure for obtaining technical specifications and gasification

3 working days are allotted for consideration and decision making on the applicant’s appeal to the management company. At the end of this period, a positive response is given or documents with the reason for the refusal are returned to the property owner.

In the absence of legal obstacles, the technical conditions are given 14 days. All the necessary package of documents is prepared with the need for building materials appended, an installation estimate is prepared.

The validity period of gasification technical specifications is 70 days. After that they are canceled. Based on this, you need to connect the house to communications immediately after obtaining permission.

There are certain nuances due to which the development and issuance of technical specifications for gas supply can drag on indefinitely.The pipeline route can pass through private sections, security zones, highways of federal significance. Obtaining permission to cross these places can be very difficult.

Consent of the main subscriber to connect

To connect the house to the gas network owned by a legal entity, you must obtain his written consent, certified by the established procedure. The owner may be individual entrepreneurs, various companies and partnerships.

The agreement form may be arbitrary or pre-developed if such cases occur often enough. The contract shall indicate the passport data of the parties, their addresses, name and location of the object. If the service is paid (and this is the right of the main subscriber), the amount is indicated, a fiscal check or receipt in cash is attached to the paper.

When the pipe is laid through the neighbors, it is necessary to coordinate this issue with them. The paper should indicate the possibility of gaining access for inspection, repair and modification.

Process Connection Stages

After receiving the technical specifications for gas, the owner of the property can begin construction. For this, a contract is drawn up with an organization licensed to carry out gas operations. If the laying is carried out independently or by hired workers, the gas office will not accept such equipment.

The sequence of technological connection of the gas pipeline to the house:

  1. Installation of equipment (consumers) in accordance with the project. Checking their completeness and stability. Testing the ventilation system.
  2. Arrangement of strapping, fastening and connecting radiators.
  3. Digging a pit or installing supports if an elevated pipeline is selected.
  4. Laying a gas pipeline, bringing it into a building and connecting to internal communications. Falling asleep trenches, installation of signs indicating the protection zone.
  5. Installation of the electromagnetic valve, installation of the power supply and alarm.
  6. Preparation of a place for tie-in to the highway, pipe connection
  7. Start-up of gas, verification of the operability of the structure, adjustment and calibration of devices.
  8. Sealing the counter.

The final stage is the act of putting the facility into operation. The document shall indicate the meter reading and the date of its scheduled inspection.

Gasification at home

The gasification regulations for private homes are spelled out in Decree of the Government of the Russian Federation No. 1314. The document spells out all the details of the legal execution of the agreement between the supplier and consumer of services, technical aspects of laying the gas pipeline.

Practical and legal aspects of supplier responsibilities:

  1. Checking the compliance of the work performed with the technical specifications.
  2. Monitoring the absence of the possibility of extraneous interference in the meter.
  3. Conclusion of a contract for the supply of gas to the consumer.
  4. Briefing on the rules for using equipment, metering and control devices, the procedure for detecting a malfunction or gas leak.
  5. Clarification of liability for unauthorized changes in the layout of the gas pipeline, obstruction of representatives of the management company in access to equipment, untimely payment for the services provided.