How to bring water to a private house from the central water supply

Private house water supply is an integral part of a comfortable life. Connecting to a central water supply is one of the most convenient and easiest ways to provide your own site with clean drinking water without interruption. But you will have to pay for the implementation of the project no less than when organizing other ways of obtaining water.

Benefits of connecting to a water supply

To connect and revise, you need to equip a viewing well

Central water supply gives several advantages to the owner of a private house:

  • there is no need to buy a pumping station and organize a place for its installation;
  • lack of need for drilling, organization and analysis of well or well water;
  • water from the central water supply meets sanitary standards and is suitable for consumption;
  • the pipeline network maintains standard pressure;
  • water is supplied almost without interruption - short-term technical interruptions are possible.

Each customer has the right to choose independent work or the invitation of specialists to organize a water supply. However, the whole process must be approved and regulated by the decisions of local authorities and the city water channel.

Rules for joining a private house to the central water supply

Scheme of connecting the house to the water supply

To conduct water from the central water supply to the site with your own hands, certain conditions must be observed. They are regulated by government decree of July 29, 2013 No. 644. The main rules regulated by the regulation:

  • drawing up an approved contract according to the existing scheme;
  • the presence of an application for connection, which is submitted to the territorial authorities - the application is considered within 5 days;
  • obtaining technical conditions for tapping into the water supply system, which must be strictly observed;
  • after receiving the documents, the service checks them within 3 days, determines the balance of drainage and water supply, technical feasibility;
  • in the presence of incorrectly executed or incomplete documents, the customer receives a notification, within 20 days he must collect and send the missing information;
  • if after 20 days this has not happened, the application is canceled.

If everything is done correctly, the territorial authority service issues a permit. Vodokanal draws up a contract within 20 days and sends it to the customer. It indicates the conditions, cost of work and payment.

Water supply services, according to the law, cannot refuse to draw up a contract to the customer if there is technical capability. If this is not possible, create an individual project.

Payment is made as follows: 35% within 15 days after the conclusion of the contract, 50% - within 3 months from the start of work, but not after their completion, and another 15% within 15 days after signing the final acts confirming the guarantee of water supply to the house.

Necessary documents and where to contact them

Sample contract

The contract for providing the house with cold water from the central water supply system is formed on the basis of an application from the customer or a representative authorized by the owner of the house. The application must contain the following information:

  • Details of the subscriber. Detailed information about the place of residence and registration, as well as the full name, copy of the passport or identity documents, contact information.If a legal entity draws up an application, the registration number in the State Register, as well as TIN, bank details must be provided. When connecting a legal entity, you must provide confirmation of the subscriber’s right to sign business documents.
  • Name and position of the object: address and plan of the private house for which the contract is being prepared.
  • Full information about other sources of water. It should include the amount of water received, the number of owners through whose networks water is drawn.
  • Information about the type of activity. It is necessary when connecting standard spillways.
  • Composition, properties and dynamics for the year of discharge of sewage water. Required if there are any established standards for the customer.
  • Land area, as well as a description of all objects with detailed characteristics located on the site.

Together with the application, the customer must submit a certain package of documents allowing to connect water to a private house from the central pipeline:

  • copy of passport, rights, other identity document, as well as a power of attorney during the work of a proxy;
  • copy of property rights to the site connected to the system;
  • area of ​​irrigated land, land and associated premises, as well as the number of residents;
  • documents for NGOs, housing cooperatives, other agreements with resource-supplying bodies;
  • a copy of the contracts for connecting the subscriber to the highway, if available in the past;
  • copies of documents on washing or disinfecting equipment inside the house or on the site;
  • sample location diagram;
  • copy to the water meter for verification with the standards;
  • copy of paper confirming ownership of the site;
  • balance of maximum water consumption;
  • positive expert opinion.

You can clarify the list of required securities in the city water department, in some cases the list may vary.

Project drafting

Scheme of connecting plots to the water supply

For the design of water supply will have to attract specialists - the design team of the water utility. It will consist of the following elements:

  • estimate with a statement of resources;
  • graphic display of the plan and explanatory note;
  • custom specification.

The sidebar is designed according to the following plan:

  1. In the water utility, they present the plan of the site 1: 500.
  2. Draw up an application for connection to the water supply, attach documents on land tenure and property rights. A month later, they receive a refusal or approval with the connection conditions: pipe diameter, insertion point.
  3. They apply to the sanatorium together with the documents received and draw up an application for a conclusion on the tie-in.
  4. Draw up a connection project and register it in a sanatorium.
  5. The municipal system on the basis of documents issues a permit for construction and land works.

After that, they begin to implement the project, attracting licensed services for digging trenches and tapping into the channel pipe.

Center line connection diagram

The connection scheme is determined by the materials used, access points, as well as the installation location of metering devices. The main point in this scheme is an insert into the central water supply. It is carried out by special clamps or fittings, adapters.

The tie-in point in the central well should be convenient and accessible for technical supervision. Usually it is determined by the specialists of the water supply channel.

Work sequence

The easiest way is to order the organization of the water supply directly from the employees of the city water utility, but you can do this in other licensed organizations. Connection is carried out in the following order:

  1. Connection via cover plate

    The choice of the method of connection to the highway. Most often, the simplest option is used - overlay of clamps on steel or plastic pipes. Additional tools are also used, because the water in the pipes is under pressure.

  2. Pipeline material selection.Determine the appropriate material for the pipes from the point of intake to the house - lightweight, durable, corrosion-proof low-pressure polyethylene (HDPE).
  3. Installation of metering devices, purchase of fittings. These are the main elements for connecting the house to the highway.
  4. Creating a well of concrete. At the insertion point, a concrete well is made of rings, and next to the house is a pit of the required depth for bringing water into the house.
  5. Creating a trench. Using the technique, they dig the desired depth of the trench, lay the PND pipeline and fill it with sand to create a sand cushion, it is possible to use thermal insulation.
  6. Connecting items. Through fittings, the pipe is connected to the highway with a shut-off valve and metering device.

After these steps, water is supplied to the house. In the house, the pipeline is bred in series or in parallel.

The pipeline in the house should be strictly horizontal or vertical, the lines should not intersect. When using compression fittings, it is important to ensure easy access to all points. At the entrance of each branch make a shut-off ball valve. A sand filter is also installed. In this case, the diameter of the bends from the line should be less than the main highway.

Connection cost

The cost of work is largely determined by the length of the water pipes, the material, the depth of the pipeline, as well as the service area. Average prices for connecting water from a central water supply to a private house:

  • designing - 5000;
  • receipt of technical conditions - up to 5000;
  • coordination - 10,000 - 12,000;
  • the cost of materials - from 10,000 rubles with a track length of 10 m;
  • sidebar and connection - up to 50,000;
  • excavator rental - up to 10,000;
  • network installation and laying - up to 3000 per 1 running meter.

In cold regions, additional pipe insulation is required, which increases costs by 5-10%. On average, the cost of organizing water supply from the central network cannot be less than 80,000 rubles, but can reach 200,000 - 300,000.

Connecting a house to a centralized water supply network is a task that requires accurate planning and considerable financial investments. If you follow all the steps in sequence and buy quality materials, it is not as difficult to implement as it might seem at first glance.