How to install air conditioning in an apartment and a house yourself

Answering the question: how is air conditioning installed? It should be said right away that installation alone cannot be mastered. I need an assistant. This is a long and painstaking business. It requires special skills, knowledge and equipment (see the video on how to install the air conditioner yourself).

What tools are needed?

How to install air conditioningBefore installing the air conditioner yourself, you need to get the necessary tools:

  • a drill with a set verified;
  • screwdriver, knife;
  • level;
  • adjustable wrench;
  • Vacuum pump;
  • rolling (look at the photo how to install air conditioners);
  • pipe cutter;
  • brackets;
  • copper pipe for the route (see diameter for instructions);
  • thermal insulation for pipes;
  • plastic tube for drainage.

Indoor unit installation

Installation begins with the installation of the indoor module. It is more convenient to mount it on the outer wall or as close to it as possible, going down from the ceiling by 25 - 30 centimeters.

The first stage of how the air conditioner is installed is the fastening of the metal frame to the wall. Be sure to level it. The box must be hung at a slope of 5 mm per meter in the direction of the street so that the drainage drains.

Before you install the air conditioner yourself, two holes are drilled into the street for laying a copper pipe and drainage, also at an angle. They are pulled along with the electric cable.

Outdoor unit installation

Under the level, places for brackets are marked. As a rule, this is done from a window, you can use climbing equipment (see video how to install air conditioners). Once the unit is installed, it is immediately screwed on and connected. He is very heavy. Bolts for fastening are included, washers are installed on both sides.

Track assembly

Those who are only interested in the question: how is the air conditioner installed, can not read more. Now the hardest part is laying the track.

First, the indoor unit is connected. A nut is put on a cleanly cut tube, the plugs are removed, and the tube is rolled. It should protrude by 2 millimeters - this is the secret of perfect rolling, which can be seen in the photo how to install air conditioning. After which the nut is screwed, very tightly and everything is repeated with the outdoor unit. Physically, this is difficult, because the procedures are carried out on weight. The whole process, see the video how to install the air conditioner yourself.

Evacuation of the track

We attach the pump tube to the port for refueling and vacuum (see the video how to install the air conditioner). Do not open ports! The duration of the procedure is 15-30 minutes to draw out all the water vapor.

At the end of the evacuation, the valve closes, but the pump does not disconnect. It is necessary to hold it for another quarter hour. If during this time the arrow does not change position, it means that the track is well assembled and there are no leaks, we managed to mount without errors.

Starting the air conditioner must be carried out by the master from the service center. Otherwise, the warranty will be voided.